Water supply to proceed
The Paparua County Coun-. i cil will proceed with extensions to its high-pressure i water supply in spite ot“ contrary provisions tn the> draft Canterbury regional, planning scheme. The scheme says that] where water mams are 1 routed through the “green. belt," they should not serve:’ any “unplanned settle-i ments” in the belt. The council will extend its,: high-pressure water supply to Worsieys Spur through a “green belt” area and wants!’
jto offer connections en route ’to existing houses. But in the draft scheme these are "'unplanned settlements.” i “For us to lay water pipes I past existing houses and not [feed them is ludicrous.” Mid i the Paparua County Engineer (Mr J. D. Annan). About 12 houses are volvedPipes have been laid down Hendersons Road to Cash imere Road but will not be ■ laid in Cashmere Road for about 18 months, according 'to Mr Annan.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19790802.2.80
Bibliographic details
Press, 2 August 1979, Page 7
Word Count
150Water supply to proceed Press, 2 August 1979, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.