New theatres preferred
Plans to spend about SIM to improve operating theatres at the Christchurch i Hospital have been dropped in favour of a proposal to include them in a new building. The Hospital Board expects planning and construction of a new suite of operating theatres and related services such as a
[pathology laboratory and a (central sterilising unit to (take more than six years. No estimate of cost is available but it may exceed S6M, depending on how many new theatres are planned to replace the four operating theatres now in use. Maintenance programmes will continue on existing theatres to keep them up to [standard.
The decision not to proceed with the plans to improve existing operating theatres is the result of opposition to the proposal from surgeons and anaesthetists at the hospital. They want new theatres and related services to be included in the S6OM redevelopment plan for the hospital.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19780601.2.38
Bibliographic details
Press, 1 June 1978, Page 4
Word Count
152New theatres preferred Press, 1 June 1978, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.