Heated pool level up
To encourage adults to use the heated indoor learners’ pool at the Centennial Pool during winter, the water level is to be raised to three feet during the two-hour lunch period. From today, the water level will be raised 6in during the “adults” period from 12 noon to 2 p.m. Last year, the level of the pool was left at 2ft 6in during the adults period. It was not deep enough, said the pool supervisor (Mr Rex Page). It took 20 minutes to raise the water level 6in in the 20 metre pool and 10 minutes to lower it to the learners' level. The water released flows into a large tank. Mr Page said the midday period was the only reasonable time to raise the water levei. because of the needs of other swimmers.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19760405.2.168
Bibliographic details
Press, Volume CXVI, Issue 34120, 5 April 1976, Page 21
Word Count
138Heated pool level up Press, Volume CXVI, Issue 34120, 5 April 1976, Page 21
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.