This new bridge across Boundary Stream, between Pukaki and Mount Cook, will he opened soon. The bridge is 11 miles from the high dam which is being constructed. Work on the new highway to Mount Cook has now reached the 14-mile mark, leaving about 22 miles to go.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19731220.2.54
Bibliographic details
Press, Volume CXIII, Issue 33413, 20 December 1973, Page 9
Word Count
48This new bridge across Boundary Stream, between Pukaki and Mount Cook, will he opened soon. The bridge is 11 miles from the high dam which is being constructed. Work on the new highway to Mount Cook has now reached the 14-mile mark, leaving about 22 miles to go. Press, Volume CXIII, Issue 33413, 20 December 1973, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.