BUILDING CURBS
(N.Z. Press Association)
WELLINGTON, Oct. 27. “There is some evidence that pressure on the building industry is likely to increase,” the Minister of Finance (Mr Muldoon) told Parliament tonight. “As a precautionary measure, it is proposed to extend the existing building programme on a national basis and to increase the maximum period of deferment from two years to three years. Restraint will be exercised where necessary over a wider area of classes of construction than under current policy.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19701028.2.5
Bibliographic details
Press, Volume CX, Issue 32439, 28 October 1970, Page 1
Word Count
80BUILDING CURBS Press, Volume CX, Issue 32439, 28 October 1970, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.