NEW SHIP FOR NAVY
120 Feet Of Hull Laid (N.Z. Press Assn.—Copyright) LONDON, May 14. The latest ship for the Royal New Zealand Navy, H.M.N.Z.S. Canterbruy, is taking shape at the Glasgow yards of Yarrows Shipbuilders. The frigate is being built on a prefabricated basis. Construction started last January. The vessel is to be launched about the middle of next year. The builders have already laid about 120 feet of the hull. The New Zealand Navy has established a project officer in Glasgow to co-ordinate dealings with the shipbuilding firm.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19690515.2.179
Bibliographic details
Press, Volume CIX, Issue 31988, 15 May 1969, Page 24
Word Count
90NEW SHIP FOR NAVY Press, Volume CIX, Issue 31988, 15 May 1969, Page 24
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.