CONCRETE SUPPORTS for the new Kilmore Street bridge under construction. The recentlycompleted Madras Street bridge is at top left. The new bridge will link the two sections of Kilmore Street.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19681119.2.206
Bibliographic details
Press, Volume CVIII, Issue 31840, 19 November 1968, Page 28
Word Count
30CONCRETE SUPPORTS for the new Kilmore Street bridge under construction. The recentlycompleted Madras Street bridge is at top left. The new bridge will link the two sections of Kilmore Street. Press, Volume CVIII, Issue 31840, 19 November 1968, Page 28
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.