Timber Factory
(Prom Our Own Reporter) GREYMOUTH, March 17. A $lOO,OOO timber-process-ing factory for the new forest sawmilling company at Ngahere is expected to be completed by the end of the year. A railway siding to the site of the mill will come into use tomorrow.
Now that the siding was completed the company was able to go ahead with the main building, said the manager of the present mill (Mr J. F. Tibbles). The new factory will be capable of producing five million board feet of timber a year.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19680318.2.6
Bibliographic details
Press, Volume CVIII, Issue 31631, 18 March 1968, Page 1
Word Count
90Timber Factory Press, Volume CVIII, Issue 31631, 18 March 1968, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.