Wrong Switch
(From Our Own Reporter) TIMARU, January 17. The whole of Timaru City, the Albury substation area, Tekapo and the Mackenzie County Council’s area, were without power from 8.28 a.m. to 8.40 a.m. today.
Tlie failure was caused by a mistake during switching at Grants hill substation, Timaru, said a spokesman for the N'ew Zealand Electricity Department.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19660118.2.17
Bibliographic details
Press, Volume CV, Issue 30961, 18 January 1966, Page 1
Word Count
58Wrong Switch Press, Volume CV, Issue 30961, 18 January 1966, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.