Will Not Meet Half Cost
A request from the City Council that it meet half the estimated cost of £4889 to pipe St. Albans creek through English Park was not accepted by !the Christchurch Drainage Board last evening. The works committee reported that in 1962, when the estimated cost was £3300, the board had agreed to find £l5OO. The board was told at the time that if piling was needed, the cost would be about £4BOO. It now transpired that piling was needed. The board agreed to adhere to its original decision to find a maximum of £l5OO.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19651222.2.23
Bibliographic details
Press, Volume CIV, Issue 30940, 22 December 1965, Page 3
Word Count
98Will Not Meet Half Cost Press, Volume CIV, Issue 30940, 22 December 1965, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.