STANDARD ARMY BARRACKS—An architeet’a drawing of the New Zealand Army’s new ferro-concrete. 154-bed barrack Mock recently approved by the Government. Construction has begun at Burnham and Linton camps. Eventually (subject to sanction for each one) 13 of these blocks, with complementary mess buildings, will be established at various eamps throughout the country. Ministry of Works: F. G. F. Sheppard, Government architect
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19630725.2.84
Bibliographic details
Press, Volume CII, Issue 30192, 25 July 1963, Page 10
Word Count
61STANDARD ARMY BARRACKS—An architeet’a drawing of the New Zealand Army’s new ferro-concrete. 154-bed barrack Mock recently approved by the Government. Construction has begun at Burnham and Linton camps. Eventually (subject to sanction for each one) 13 of these blocks, with complementary mess buildings, will be established at various eamps throughout the country. Ministry of Works: F. G. F. Sheppard, Government architect Press, Volume CII, Issue 30192, 25 July 1963, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.