Fiji-Auckland Cable Plans
(N.Z. Press Association) AUCKLAND. Sept 1« The cable-laying ship. Monarch, had left England to lay the first lengths of the FijiAuckland link in the Commonwealth Pacific telecommunications cable, the Direc-tor-General of the Post Office. Mr Dawson Donaldson, said in Auckland today. The same technique will be used in the laying of this cable as was used for the Sydney-Auckland link. The Fiji-Auckland cable is expected to be complete by the end of this year, and the final Pacific link is expected to be complete by the end of 1963
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19620920.2.183
Bibliographic details
Press, Volume CI, Issue 29932, 20 September 1962, Page 16
Word Count
92Fiji-Auckland Cable Plans Press, Volume CI, Issue 29932, 20 September 1962, Page 16
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.