NEW BOILER FOR MINE
Engineers Freed For Other Duties (N.Z. Press' Association) DUNEDIN, July 6. The “ridiculous” position of three qualified engineers maintaining a 24-hour watch on the massive Kaitangata mine boilers to provide showers for the miners, would end with the installation of an automatic boiler soon, a State Coal Department spokesman said today. The boilers had worked throughout the days maintaining a ’ steady temperature in the changing room and providing water tor the 140 miners. It had been necessary to employ three fully-qualified engineers exclusively in the boiler-house for maintenance work.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19620709.2.59
Bibliographic details
Press, Volume CI, Issue 29869, 9 July 1962, Page 7
Word Count
93NEW BOILER FOR MINE Press, Volume CI, Issue 29869, 9 July 1962, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.