BUILDING THE SCHEME
The firms responsible for constructing the new Kimberley water race scheme are Wilkins and Davies, Ltd., for the tunnelling, the Canterbury Tractor Company, Ltd., of Rolleston, for most of the earthworks and channelling, and Jeal and Skurr, of Oxford, for laying the pipes in the tunnels and an earthworks contract which is still in progress.
The scheme was designed by Messrs H. G. Royds and Sutherland, consulting engineers to the county. Mr Guy Evans, a mejnber of the firm,'- has been the project engineer.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19610309.2.200
Bibliographic details
Press, Volume C, Issue 29458, 9 March 1961, Page 21
Word Count
87BUILDING THE SCHEME Press, Volume C, Issue 29458, 9 March 1961, Page 21
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.