ROD, BIT JAMMED IN BORE
Drilling Stopped On Oil Project (New Zealand Press Association) NAPIER, August 25. Drilling operations at the Mangaone No. 1 deep test bore in the 8.P.-Shell-Todd oil exploration project near Morere have been suspended while drillers endeavour to recover 102 feet at boring rod and a bit jammed 4000 feet down the well.
The rod was lost some days ago when the mudstone formation through which the well is being l pushed collapsed. Since then drillers have been trying to remove the rod by numerous means but so far all have tailed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19600826.2.151
Bibliographic details
Press, Volume XCIX, Issue 29293, 26 August 1960, Page 13
Word Count
96ROD, BIT JAMMED IN BORE Press, Volume XCIX, Issue 29293, 26 August 1960, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.