Nelson Railway
Sir, —I see that “The Press” editorially now has the cost of the Nelson trunk rail link up to “about £2O million.” For you the sky is apparently the limit. You are outbidding your collaborator, Mr J. K. McAlpine, by nearly £2 million. Yet the Ministry of Works, which is in possession of the facts, some of which Mr McAlpine very rightly says he is "ignorant” about, and which is objectively skilled in estimating railway construction costs, says the line will cost about £10.3 million to build. The point for the people to note about this editorial irresponsibility is that much of your other argument pretending to show why the line should not be built bears the same specious hallmark and can be 11 similarly discounted. You have no basis for your claim except wild guesswork, which shows how the standard of editorial responsibility in "The Presss” has deteriorated.— Yours, etc, , DIESEI Nelson, July 5, 1960.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19600707.2.50.8
Bibliographic details
Press, Volume XCIX, Issue 29250, 7 July 1960, Page 7
Word Count
158Nelson Railway Press, Volume XCIX, Issue 29250, 7 July 1960, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.