CAPE FOULWIND CEMENT
Production Started At Works
(From Our Own Reporter) WESTPORT, November 20. History was made in the Buller district this morning when the first cement was produced from, jthe New Zealand company’s} works at Cape Foulwind. The; kiln had been lit for some days, and. with sufficient clinker made.! it was possible to make the first tests in actual cement making today. The works will soon be running at full capacity, and already three shifts are being worked. All but the key personnel are being transported to and from Westport by motor transport. Regular supplies of limestone are now more easily procurable from the quarry, after considerable initial difficulties due to pockets of heavy soil being encountered.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19581122.2.54
Bibliographic details
Press, Volume XCVII, Issue 28750, 22 November 1958, Page 8
Word Count
119CAPE FOULWIND CEMENT Press, Volume XCVII, Issue 28750, 22 November 1958, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.