Desert Road Open Again
(New Zealand Prefs Association) AUCKLAND, February 28. The 95-foot Bailey bridge was completed across the Tongariro river at Turangi this morning and the Desert road was open for traffic from about 10.30 a.m. The Ministry of Works is now engaged in consolidating the repairs they have made along the Taupd-Turangi highway. Workmen repairing the Hinemaiaraia power-house, which provides Taupo with electricity, now believe the flood damage to the equipment 1 may be less than was feared. The machinery is being stripped down and dried, but the full extent of the damage will not be known until each part is tested.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19580301.2.109
Bibliographic details
Press, Volume XCVII, Issue 28524, 1 March 1958, Page 12
Word Count
104Desert Road Open Again Press, Volume XCVII, Issue 28524, 1 March 1958, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.