DIAMOND HARBOUR WATER SUPPLY OPENED.—The Mayor of Lyttelton (Mr F. G. Briggs), on right, turns on the tap to open officially the water supply pipeline from Lyttelton to Diamond Harbour, on Saturday. On left, the water gushes from the nose held by Mr B. M. Schenkel, foreman in charge of the project, which cost £57,506.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19550404.2.121
Bibliographic details
Press, Volume XCI, Issue 27625, 4 April 1955, Page 12
Word Count
55DIAMOND HARBOUR WATER SUPPLY OPENED.—The Mayor of Lyttelton (Mr F. G. Briggs), on right, turns on the tap to open officially the water supply pipeline from Lyttelton to Diamond Harbour, on Saturday. On left, the water gushes from the nose held by Mr B. M. Schenkel, foreman in charge of the project, which cost £57,506. Press, Volume XCI, Issue 27625, 4 April 1955, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.