MINISTER’S COMMENT
(New Zealand Press Association) WELLINGTON, June 15. The Minister in charge of the State Hydro-electric Department (Mr W. S. Goosman) said tonight that the new line and sub-station connecting Buller with the main South Island system marked yet another stage in the linking up of the various parts of the South Island At a later stage, the West Coast of the South Island would also be electrically joined to the Nel-son-Marlborough system by a new line already under construction and which would serve to make power from the new Braeburn station available to the whole of the north-western section of the South Island, said Mr Goosman.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19540616.2.91
Bibliographic details
Press, Volume XC, Issue 27377, 16 June 1954, Page 10
Word Count
108MINISTER’S COMMENT Press, Volume XC, Issue 27377, 16 June 1954, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.