AUCKLAND HARBOUR BRIDGE
START OF WORK LIKELY THIS YEAR (New Zealand Press Association) AUCKLAND, March 19. It is almost certain that a start will be made with the construction of the Auckland harbour bridge this year. Sir John Allum, chairman of the Harbour Bridge Authority, has advised the Local Government Loans Board by cablegram from England that the bridge can be built to the revised specifications for about £5.000.000. A confirmatory report by engineers is being sent by air mail from England. and should reach Wellington in time for the next meeting of the board on March 30. If the bdard is satisfied with the report, it will formally confirm its decision sanctioning the raising of th* necessary finance.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19540320.2.57
Bibliographic details
Press, Volume XC, Issue 27303, 20 March 1954, Page 6
Word Count
119AUCKLAND HARBOUR BRIDGE Press, Volume XC, Issue 27303, 20 March 1954, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.