STATE HOUSING BLOCK
SEWERAGE FOR AREA IN SHIRLEY
The estimated cost cf providing sewerage services for 434 houses to be built by the Housing Department in Emmett’s block. Shirley, is £22,780. including £4OOO for a pumping station. This was reported to the Christchurch Drainage Board last evening The board had agreed to a proposal that the department should be allowed to build the necessary main, sewer, pumping station, and rising main to discharge to the existing siphon under the river at Dallington, connected to the Wainoni pumping station. Financial details will be discussed by the board and the department, and the board last evening adopted a report by its finance committee recommending that the department should be required to find the whole of the capital cost of the work, and that the board should refund the cost when development warranted major -sewer extensions in areas outside the State housing block.
In computing the amount, to be refunded. it was recommended that allowance should be made for the £2576 the department had agreed to contribute to the cost of the pumping station in Marshland road. The board should reserve the right to allow connexions to the proposed sewer or pumping station, and should operate and maintain the whole service.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19480922.2.15
Bibliographic details
Press, Volume LXXXIV, Issue 25606, 22 September 1948, Page 3
Word Count
208STATE HOUSING BLOCK Press, Volume LXXXIV, Issue 25606, 22 September 1948, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.