CAUSE OF POWER FAILURE
DEFECT IN SWITCH AT WAITAKI
“I understand that a switch blew out at the Waitaki power station, ahd the reason for the general power failure in the South Island on Tuesday night would probably be because Waitaki was carrying the greater part of the load at that late hour,” said Mr F. T. M. Kissel (general manager of the State Hydro-Electric Department) when a reporter of “The Press” telephoned him at his home in Wellington last evening. . It is understood that the district engineer of the State Hydro-Electric Department (Mr W. H. Gregory) And the assistant district engineer (Mr E. E. James) went to the Waitaki power station yesterday.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19480311.2.76
Bibliographic details
Press, Volume LXXXIV, Issue 25440, 11 March 1948, Page 6
Word Count
113CAUSE OF POWER FAILURE Press, Volume LXXXIV, Issue 25440, 11 March 1948, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.