PRODUCTION OF COAL FROM REEFTON FIELD
, Coal mines on the Reefton field in the week ended April 7 produced for railage from the Reefton railway station 2102 tons of coal. As the working period was broken by both Easter Monday and a “pay Saturday ” the output represented only four days’ work. '
An ascent of Mount Hutt was made during the week-end by five members of the Erewhon Mountaineering Club. From the summit, the party obtained a splendid view of the main range as far as Mount Cook. , _
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19450410.2.25
Bibliographic details
Press, Volume LXXXI, Issue 24537, 10 April 1945, Page 3
Word Count
87PRODUCTION OF COAL FROM REEFTON FIELD Press, Volume LXXXI, Issue 24537, 10 April 1945, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.