BRITISH ELECTRIC RAIL SERVICE OPENED
(BRITISH OFFICIAL WIKELESS.) RUGBY, July 1. The Southern Railways main line electrification between London and Portsmouth, completed at a cost of £3,000,000, was opened to-day.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19370703.2.92
Bibliographic details
Press, Volume LXXIII, Issue 22135, 3 July 1937, Page 15
Word Count
30BRITISH ELECTRIC RAIL SERVICE OPENED Press, Volume LXXIII, Issue 22135, 3 July 1937, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.