THE RAILWAY MISHAP.
TRACK REPAIRED. Most of the rolling stock that participated in the mishap to the Arthur's Pass-Christchurch train on Tuesday, was taken to Addington yesterday to be inspected and overhauled. Owing to its peculiar position, however, the engine was not touched, it is hoped to replace the engine on the line to-day. Meanwhile the railway track has been repaired, and the train for Arthur's Pass will be able to get through as usual to-day.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19230308.2.36
Bibliographic details
Press, Volume LIX, Issue 17707, 8 March 1923, Page 6
Word Count
76THE RAILWAY MISHAP. Press, Volume LIX, Issue 17707, 8 March 1923, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.