CHANNEL TUNNEL.
COST ESTIMATED AT £20,000,000. (By Cable. —Press AECOoiation.—Copyright.) (Australian and N.Z. Cablo Association.) . LONDON, March 11. Tho Channol tunnel scheme tindei consideration provides for two tubes 30 miles long, and costing £20,000,000. The construction will occupy five years. A Commission at Paris is also considering tunnols at Constantinople and Gibraltar, giving diroct rail communication from Puropo to Asia and Africa. The Commission hns already agreed on the advisability of the schemes. .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19190313.2.80
Bibliographic details
Press, Volume LV, Issue 16470, 13 March 1919, Page 7
Word Count
73CHANNEL TUNNEL. Press, Volume LV, Issue 16470, 13 March 1919, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.