MINING NEWS
UNA HILL PROGRESS i ! Una Hill fThames) reports that during the period ended July 25 the Intermediate drive on the Specimen reef was advanced northward on what appears to be the Junction of the Occidental reef with the Mo. 2. This would be an important development. I particularly as gold is visible in the stone over a I vide face. The rise in the south end has been holed through, giving another outlet for ore from the stope on the No. 2 branch. Quartz from TJr.a Hill is being steadily carted to the crushing plant I at Komata. which is going through trial runs and is giving satisfaction. WELLINGTON ALLUVIALS ■ Wellington" AlUivlals. Limited (New South able on August 27. YIELDS OF COMPANIES Nfnor.light Goldfields.—The wash-up on July 24 rit. the sluicing claim was 4807. 17dwt. Olutha fOtago).—3Boz in 125 hours. Oillepple's Beach < Westland).—3l'ioz from 16.000 ynrrts in 13.1 hours. Okarito (Westland).—l9oz in 102 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19410729.2.19.6
Bibliographic details
Auckland Star, Volume LXXII, Issue 177, 29 July 1941, Page 3
Word Count
156
MINING NEWS
Auckland Star, Volume LXXII, Issue 177, 29 July 1941, Page 3
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
This newspaper was digitised in partnership with Auckland Libraries.