OIL BORING PROGRESS.
MIDHIRST DOWN TO 6185 FT. A bulletin issued by the New Zealand Petroleum Company reports that at Morere (East Coast) bore operations for the recovery of the drill pipe are still continuing. The Midhirst well (Taranakl) has been drilled to a depth of 6185 ft. The formation is hard, grey shale.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19410412.2.25
Bibliographic details
Auckland Star, Volume LXXII, Issue 86, 12 April 1941, Page 4
Word Count
54OIL BORING PROGRESS. Auckland Star, Volume LXXII, Issue 86, 12 April 1941, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.