Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image

POWER DEVELOPMENT

WORK AT ARAPUNI. ADDITIONAL TURBINES. PUTARURU, this day.' Work on the installation of two additional turbines at Arapuni, which was suspended two months ago on account of the shortage of. steel, is to be resumed before the end of the month. The six turbines at present operating at Arapuni are working at full pressure to meet the growing demand for electricity, and the installation of the additional turbines will ease the position.

When the work was suspended owing to the impossibility of obtaining steel for lining the penstock tunnels, the tunnele had been pierced between the water race and the power-house and the penstock gates placed in position.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19400829.2.144

Bibliographic details

Auckland Star, Volume LXXI, Issue 205, 29 August 1940, Page 18

Word Count
110

POWER DEVELOPMENT Auckland Star, Volume LXXI, Issue 205, 29 August 1940, Page 18

POWER DEVELOPMENT Auckland Star, Volume LXXI, Issue 205, 29 August 1940, Page 18

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert