MINING.
BRIAN BORU DREDGE.
The Brian Boru Dredge, which is operating near Greymoutli, returned 390z for 94 hours last week.
KING SOLOMON PROSPECTS.
Reporting under date August 18, the mine manager at King Solomon (Gore), states the work of opening up new ground is in full swing, and the volume and value of the gold-bearing wash are exceeding all expectations. At the present rate of progress, and providing the wash keeps in, large reserves are being added to. the already sound condition of the mine.
LAWSON r S FLAT WASH-UP.
The Lawson's Flat: Company (Kumara) reports a wash-up of 31oz during operations in the past fwo weeks.
F£ESHFORD RETURN,
' The JPreshfoEtl Gold Dredging Company, Limited (Southland) rfiports a return of lOoz The dredge has been working through a b'ank of clay, which accounts tor the small return. ,
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19330825.2.36.5
Bibliographic details
Auckland Star, Volume LXIV, Issue 200, 25 August 1933, Page 4
Word Count
137MINING. Auckland Star, Volume LXIV, Issue 200, 25 August 1933, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.