NEW WELLINGTON TUNNEL
WORK TO COST £133,000. WELLINGTON, Saturday. The Mayor of Wellington, Mr. G. A. Troup, swung the first pick for the actual tunnel work in Mount Victoria. The tunnel, when completed, will give easier access to Miriamar, Hataitai, Kilbirnie, etc. The contract price is £133,000. The tunnel will be 2045 ft long, with an inside breadth of 29ft. . .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19291223.2.102
Bibliographic details
Auckland Star, Volume LX, Issue 303, 23 December 1929, Page 9
Word Count
60NEW WELLINGTON TUNNEL Auckland Star, Volume LX, Issue 303, 23 December 1929, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.