HYDRO-ELECTRIC POWER
TARANAKI DEVELOPMENTS
(By Tclesraph.—Press Association.)
XEW PLYMOUTH, Monday
The completion of the • Taranaki Power Board's woAs at Tariki whs ■brought appreciably nearer to-day, when the Motokawa tunnel, one and three-quarter miles long, was pierced. The tunnel will eventually convey water from the Manganui River to turbines developing 4000 h.p. The engineer stated to-night that there was a possibility of the scheme being in operation before Christmas.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19260824.2.147
Bibliographic details
Auckland Star, Volume LVII, Issue 200, 24 August 1926, Page 15
Word Count
68HYDRO-ELECTRIC POWER Auckland Star, Volume LVII, Issue 200, 24 August 1926, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.