Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

PLANNING OF THE TEST-ROOM AT DAIRY FACTORIES.

G. R. B. Boswell,

Testing Inspector, Dairy Division,

The writer has noticed in the course of his official travelling that in quite a number of comparatively new factories little thought has been given to the position or convenience of the test-room, especially to its lay-out. In the case of cheese-factories the tester has been placed on the open stage without hot or cold water nearer than the making-room," and where the operator has no control over temperatures, &c. In other cases the test-room has little or no drainage or is in conjunction with the starter-room, which is also in a bad position.

All test-rooms should have a suitable bath installed to read the tests from. This should have a steam-inlet to regulate temperature, and an overflow 5f in. from the bottom to ensure that the bottles cannot be submerged. Testers should be on a solid foundation, level concrete being the most satisfactory. If the concrete block is recessed this will provide a suitable cool and convenient place in which to keep the jar of acid that is in use. All test-rooms should be provided with an abundance of light.

Testing being a very important phase of the factory routine, the operator should have a test-room that is conducive to accuracy with the minimum of inconvenience. In the case of butter - factories the test-room should be as far as possible from churns, engines, &c., owing to vibration retarding or interfering with the sensitiveness of the delicate cream scales. If possible it is advisable to detach the test-room from the main building. ' With test - rooms of this description the operators find it better to carry the samples a greater distance than have their work retarded by noise of can-steaming, vibration of machinery, and incoming and outgoing of staff. It is not desirable that test-rooms be in conjunction with store-rooms, offices, &c.

It has been common in the past to place the tester in the corner of the test - room. This should be discouraged, owing to the small steam-pipes and nipples having to be replaced periodically. This work is much easier when the tester is in a central position, and in most cases it would be in a better light.

A satisfactory lay - out for the test-room from left to right is : (i) Sample-heating tubs; (2) scales; (3) burette for acid ; (4) tester (central position) ; (5) hot-water bath ; (6) washing-up tub, and rack for wet bottles. Composite sample-bottles,. after washing, can be stored on shelf under bench away from light and in a cool position.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/periodicals/NZJAG19300620.2.4

Bibliographic details

New Zealand Journal of Agriculture, Volume XL, Issue 6, 20 June 1930, Page 391

Word Count
429

PLANNING OF THE TEST-ROOM AT DAIRY FACTORIES. New Zealand Journal of Agriculture, Volume XL, Issue 6, 20 June 1930, Page 391

PLANNING OF THE TEST-ROOM AT DAIRY FACTORIES. New Zealand Journal of Agriculture, Volume XL, Issue 6, 20 June 1930, Page 391

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert