Article image
Article image
Article image
Article image

DISABLED STEAMER

ORUNGAL LAID UP FOR THREE MONTHS GEAR-WHEEL STRIPPED Reed. 10.10 a.m. SYDNEY, Today. The disabled steamer Orungal will be laid up for three months, until a new main gear-wheel for the turbines arrives from England. The gear-wheel was stripped. It is the first time such a mishap has occurred in Australia. There was no panic among: the passengers when the breakdown occurred.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19291204.2.74

Bibliographic details

Sun (Auckland), Volume III, Issue 837, 4 December 1929, Page 9

Word Count
64

DISABLED STEAMER Sun (Auckland), Volume III, Issue 837, 4 December 1929, Page 9

DISABLED STEAMER Sun (Auckland), Volume III, Issue 837, 4 December 1929, Page 9