Article image
Article image
Article image
Article image

Notes. from Alexandra. (From Our Own Correspondent.?

ALEXANDRA, April 2. The Molyneux is about the same, being about 3ft lOin above normal. The buckets are being fitted on the ladder of the First Chance dredge. The dredges pro all working steadily. April 4. The Molyneux remains about 3ft 9in above normal. Two loads of stuff came to hand yesterday for the Fraser Flat dredge. More timber has arrived for the River Molyneux pontoons. April 6. The Molyneux is about 3ft Bin above normal. Most of the timber for the River Molyneu:: pontoons has come to hand. The planking is being pushed ahead. Work is suspended at present owing to want of timber on tho Alexandra Lead.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/OW19010410.2.93

Bibliographic details

Otago Witness, Issue 2456, 10 April 1901, Page 20

Word Count
116

Notes. from Alexandra. (From Our Own Correspondent.? Otago Witness, Issue 2456, 10 April 1901, Page 20

Notes. from Alexandra. (From Our Own Correspondent.? Otago Witness, Issue 2456, 10 April 1901, Page 20