Article image
Article image
Article image
Article image

EAST COAST RAILWAY.

TAURANGA-WAIHI SECTION. OFFICIAL INSPECTION TO-DAY. [BY TELEGRAPH. —OWN CORRESPONDENT.] TAURANGA, Thursday. Art official inspection of the section of the East Coast railway, constructed by Sir W. G. Armstrong Whitworth and Company, Limited, will be made to-mor-row by Mr. A. J. Baker, inspecting engineer of the Public Works Department. Arrangements have been made for 15 trucks of fat stock to be despatched from Paengaroa on Monday, and 19 from Taneatua on Tuesday.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19280309.2.37

Bibliographic details

New Zealand Herald, Volume LXV, Issue 19891, 9 March 1928, Page 8

Word Count
74

EAST COAST RAILWAY. New Zealand Herald, Volume LXV, Issue 19891, 9 March 1928, Page 8

EAST COAST RAILWAY. New Zealand Herald, Volume LXV, Issue 19891, 9 March 1928, Page 8