Article image
Article image
Article image
Article image
Article image
Article image

COUNTY ENGINEER’S REPORT

The following report of the works in the County was presented to the last meeting of the County Council by the County Engineer, Mr. R. E. Torrie : Since last meeting of the Council I have been concentrating on road surveys for 11.W.D. Grants and the most important ones ares are now completed and forwarded for approval. Authorities

base been received for Cloughs Road Mungatoetoe Road, Owhata Road, Snelgars Road, Spains Road, Pubata Road Gills Road, Roma Road. The following plans and specifications have been approved —Parauui RoadTekore Road, Vezas Bridge. I have made a survey of a proposed deviation through Gibson’s property to give access to Braithwaite s section. The road is on a good location, being practically straight and of even grades. The amount of grant if authorised should he sufficient to form culvert and metal the worst places. Mr. Hooper has the necessary land plan survey in hand. The contractor is making good progress with the filling approaches of Christensen’s Bridge and should have a skin of metal on before the holidays. Maintenance work is being carried out on Main Highways and the condition of road surfaces is very good at present.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NORAG19331222.2.22

Bibliographic details

Northland Age, Volume 3, Issue 12, 22 December 1933, Page 5

Word Count
197

COUNTY ENGINEER’S REPORT Northland Age, Volume 3, Issue 12, 22 December 1933, Page 5

COUNTY ENGINEER’S REPORT Northland Age, Volume 3, Issue 12, 22 December 1933, Page 5