Article image
Article image
Article image
Article image
Article image
Article image

WHIROKINO HIGHWAY.

FORMATION ALMOST FINISHED.

Formation work in building up the Whirokino stretch of the main highway south of Foxton is practically finished, and only three men now remain at this work. Preparations for the driving of pil&3 to carry the long concrete trestle structure are now under way. This will be 14ft high at its highest point, and will be connected with the old bridge in the meantime.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19371125.2.97

Bibliographic details

Manawatu Standard, Volume LVII, Issue 306, 25 November 1937, Page 10

Word Count
69

WHIROKINO HIGHWAY. Manawatu Standard, Volume LVII, Issue 306, 25 November 1937, Page 10

WHIROKINO HIGHWAY. Manawatu Standard, Volume LVII, Issue 306, 25 November 1937, Page 10