Article image
Article image
Article image
Article image

AUCKLAND HOSPITAL.

ARCHITECT’S OPINIONS. Per Press Association. AUCKLAND, Alay 31. If the Auckland Hospital Board adopts the alternative proposal before it for extensions estimated to cost £400,000, instead of favouring the first plan for new buildings costing £500,000, the city will not have a modern hospital suitable for its requirements, said Mr A. G. Stephenson, the Sydney architect who is going to Wellington to complete the plans for the reconstruction of the Wellington Hospital, when 1 he arrived at Auckland by the Alari-1 posa to-day. • . Mr Stephenson’s firm, Stephenson, I Aleldrum and Turner, drew plans some time ago for the reconstruction j of the Auckland Hospital. In a report | to the Auckland Hospital Board, Air i Stephenson’s firm recommended the de-, molition of the main block. The alter- • native proposal before the board pro-, vides, he Said, for a new ward block ! between the existing main building and the Costley building. If this was done . there was no possible chance of secur- : ing a sound plan for either initial or | ultimate development of the hospital. , Mr W. E. Bassett, consulting engineer, who co-operates with Air Stephenson’s firm in its work .with hospi- j tal buildings, is accompanying Air Stephenson, who said he honed the reconstruction of the Wellington Hospital would begin shortly before Christmas.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19370601.2.18

Bibliographic details

Manawatu Standard, Volume LVII, Issue 154, 1 June 1937, Page 2

Word Count
214

AUCKLAND HOSPITAL. Manawatu Standard, Volume LVII, Issue 154, 1 June 1937, Page 2

AUCKLAND HOSPITAL. Manawatu Standard, Volume LVII, Issue 154, 1 June 1937, Page 2