BIG LOAD
WOULD NOT USE BRIDGE
PIPI'ROA FERRY USED INSTEAD
“You ityear a lot of people con- ' demiting the Pipiraa ferry but it is giving more service than most realise,” commented the county engineer, Mr E. Hazeldine-Barber, .opt the July meeting of the Hauraki Plains County Council, when he exptlained that a driver of a vehicle with, a SKJ-dotn load had' been afraid to use the Ngatea bridge 'but had gone to the ferry to get aerasß the 'Piako river. .The fcwry, had handled the load with ease.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HPGAZ19500721.2.38
Bibliographic details
Hauraki Plains Gazette, Volume 60, Issue 4307, 21 July 1950, Page 10
Word Count
88BIG LOAD Hauraki Plains Gazette, Volume 60, Issue 4307, 21 July 1950, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Hauraki Plains Gazette. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.