Article image
Article image
Article image
Article image

BRIDGE UNSAFE.

PILES OF CENTRE SPAN. CALLANCE STREET STRUCTURE "The condition of the piles of the centre span' of Ballance Street footbridge is not satisfactory','’ stated the Borough Engineer (Mr A. Young) m a report to the Borough Council last cvenmg. dt is noticed that youths indulge in listing and swimming under the span, thereby attracting people, causing considerable crowding on the centre span. I consider it advisable that the Council should prohibit such displays as dangerous conditions are present when the bridge is crowded.” The engineer was instructed to furnish a report on the condition of the bridge ancl to erect a notice indicating that the structure was unsafe for people to congregate upon it.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GIST19271214.2.51

Bibliographic details

Gisborne Times, Volume LXVI, Issue 10459, 14 December 1927, Page 6

Word Count
116

BRIDGE UNSAFE. Gisborne Times, Volume LXVI, Issue 10459, 14 December 1927, Page 6

BRIDGE UNSAFE. Gisborne Times, Volume LXVI, Issue 10459, 14 December 1927, Page 6