Article image
Article image
Article image
Article image

AMERICAN NAVY

FAULTS TN NEW. VESSELS. [BY CABLE —PRESS ASSN. —COPYRIGHT.] WASHINGTON. October 15. There is to be a major rcrirgnjii tion of the U.S.A. Navy Depart nu n:, ;:s the result of a revelation of the faulty design and construction of new units, and particularly 12 IGOO-ton destroyers of the Anderson class. Five of these have been commissioned. They show insufficient stability under imino conditions. The changes made include rhe iratrnfer of Rear-Admiral Harold Bowen. Former Chief of the Ene.im ering Bureau, io the Command of the Naval Research. Laboratory. ;:nd RoadA'.lm’ral Williams Dubose, former Chief of rhe Construction Bureau, io the command of the model basin, and of Captain Allan Chantry, former Chief .’if the Design Section, to the Philadelphia navy yard.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GEST19391016.2.59

Bibliographic details

Greymouth Evening Star, 16 October 1939, Page 8

Word Count
124

AMERICAN NAVY Greymouth Evening Star, 16 October 1939, Page 8

AMERICAN NAVY Greymouth Evening Star, 16 October 1939, Page 8