PAVING SEASON
COMPLETING SALAMANCA ROAD
For the past fortnight the City Engineer has been endeavouring to complete paving work in hand before closing down for the: winter. It is hoped to complete the paving of Salamanca road to-day,.and the linking up of the existing rjaving in The Terrace with' that in Kelburn parade. ■. . •
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19270616.2.112
Bibliographic details
Evening Post, Volume CXIII, Issue 139, 16 June 1927, Page 13
Word Count
53PAVING SEASON Evening Post, Volume CXIII, Issue 139, 16 June 1927, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.