Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

MAIN TRUNK LINE

"BXOCKED BY FLOODS AND ■-■"-•■- -SLIPS

-,; SEVERAL SERIOUS OBTACLES.

SDJKF AN NN NFBVH ANMDV JSV

TAUMARUNUI, This Day

The railway services are held up by the slips and washouts. . A big slip at the southern end- of the Porootarao Tun-, nel.has'"blocked the connection between Te .Kuiti and .Taumarunui. Itjs expected that this slip will be cleared by noon to-day..-Slips on the Main Trunk

at Taringamotu and washouts between IWaimiha and Ongarue held the service up "for twenty-four hours. The line south of Taumarunui is also blocked, and is not expected to be open until late On Sunday. There is a big subsidence of .the., line at Piriaka. Passengers from the trains from the North were brought into Taumarunui by motor-bus, and passengers .from. the South went by motor to Piriaka, and were picked up. by the south-bound train there. This afternoon passengers for the South will leave Taumaruriui and tranship over the washout at Piriaka to the South train. The same will be done with passengers for the North. There will be no train on the Olvahukura-Ohura line until the middle of next week, owing to slips and washouts. '■:■•'■ •

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19250523.2.56.2

Bibliographic details

Evening Post, Volume CIX, Issue 119, 23 May 1925, Page 8

Word Count
191

MAIN TRUNK LINE Evening Post, Volume CIX, Issue 119, 23 May 1925, Page 8

MAIN TRUNK LINE Evening Post, Volume CIX, Issue 119, 23 May 1925, Page 8