Article image
Article image
Article image
Article image

Historic rail link again

Ferrymead will he con-: nected to the main trunk' railway line this year, for: the first time in more than; 100 years. Track is being laid on the original embankment of the Ferrymead line connecting with' the main Lyttelton-In-vercargill trunk. It will be only a temporary connection, to enable four locomotives and rolling stock to be moved from the Linwood depot to Ferryniead. The Ferrymead Trust hopes to negotiate with the Railways Department for a permanent connection. Before the building of the tunnel under the Port Hills, Ferrymead was rhe terminus of the main railway line : from Christchurch. Cargo! was ferried from there by (sea to Lyttelton.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19780819.2.54

Bibliographic details

Press, 19 August 1978, Page 6

Word Count
111

Historic rail link again Press, 19 August 1978, Page 6

Historic rail link again Press, 19 August 1978, Page 6