Article image
Article image
Article image
Article image
Article image
Article image

Big bridge job

(N.Z. Press Association

AUCKLAND. . Tenders for one of the biggest bridge jobs in the coun-i | try—the four-lane first stage |of the new Mangere bridge—were called on Wednesday by I the Minister of Works (Mr Watt). The job is estimated to be worth Ssm. I The bridge will replace a [6O-year-old structure and will [carry both motorway and I local traffic between Oneihunga and Mangere. Suspended from the structure will be a separate level for -pedestrians and cyclists. The Minister said the first stage would be completed by Hate 1977. Later it would be 'duplicated to make the full [crossing. > The bridge is the first major [structure in New Zealand to i be designed in metrics: it will be 644 m (2112 ft long and 121.9 m (72ft) wide. j The Sim foundations now i under construction reach as i far as 100 ft below the harIbour bottom to solid rock , and have been tested to withstand loads of 60 tons a [square foot.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19740201.2.180.8

Bibliographic details

Press, Volume CXIV, Issue 33448, 1 February 1974, Page 21

Word Count
166

Big bridge job Press, Volume CXIV, Issue 33448, 1 February 1974, Page 21

Big bridge job Press, Volume CXIV, Issue 33448, 1 February 1974, Page 21