Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

Kinleith man rehired

r.v.Z. Press Association)

AUCKLAND, March 8.

The status quo has resumed at Kinleith after the dismissal of a boilermaker, and a two-day stoppage by the 1100 men on the Forest Products, Ltd. expansion site. The men returned to work on Monday afternoon after the reinstatement of the boilermaker, pending a hearing by the Conciliation Commissioner (Mr G. O. Whatnall).

A spokesman for the contracting company which difc missed the man said today that the hearing did not take place. He said he understood that the issue would be decided by Mr Whatnall, but when the man was reinstated, the' Boilermakers* Union declined to take part in a hearing. As a result, the man had his job back, and the issue Of whether he was justifiably dismissed was not determined.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19720309.2.28

Bibliographic details

Press, Volume CXII, Issue 32861, 9 March 1972, Page 3

Word Count
132

Kinleith man rehired Press, Volume CXII, Issue 32861, 9 March 1972, Page 3

Kinleith man rehired Press, Volume CXII, Issue 32861, 9 March 1972, Page 3