Article image
Article image
Article image
Article image

CHRISTCHURCH HIGH-PRESSURE WATER SCHEME.

Per Press Association. CHRISTCHURCH, September 29. The high-pressure water supply for fire prevention purposes is practically completed m the centre of the city between the belts. The superintendent of the fire brigade has had a most satisfactory trial of the pressure. The work of connecting the houses is being carried on rapidly.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AG19090929.2.38

Bibliographic details

Ashburton Guardian, Volume XXXI, Issue 7913, 29 September 1909, Page 3

Word Count
56

CHRISTCHURCH HIGH-PRESSURE WATER SCHEME. Ashburton Guardian, Volume XXXI, Issue 7913, 29 September 1909, Page 3

CHRISTCHURCH HIGH-PRESSURE WATER SCHEME. Ashburton Guardian, Volume XXXI, Issue 7913, 29 September 1909, Page 3