Page image

8.—14.

List of Applications and Advances — continued.

2

Local Authority. ProviAmount sionally applied granted for. or refused. Advances. Kesult ... of Poll or T- „ Petition. New £?»S! o( r,., n . Previous ijoans. Years. Purpose of Loan. Eemarks. cou: ;ty ca NCILS -continued. & 3,526 £ 2,686 £ 5,200 225 Drainage works at Muhanga Creek. Construction of water-works for the Four Peaks Watersupply District. Metalling part of the Eltham Road Bridging Makino Stream and widening Matamaroke Road. Metalling Mangawhero Road Brought forward Cook Geraldine 885 Hawera 200 G. No poll required Carried 200 Under section 22 of the Act. 400 G. 400 120 G. No poll required Carried 120 Under section 22 of the Act. '/ • • 200 G. 200 Construction of portion of Conway Road. Metalling Anderson Road .. Construction of county main road through Arapaepae special district. Drainage of Mangapouri Creek, Otaki. Metalling portion of county main road. Construction of the county main road. Construction of bridle-track to Wainui. Roads and bridges construction Construction of Vinegar Hill Bridge Horowhenua 100 1,000 P.G. G. Carried *700 Uncompleted. 500 G. 350 500 G. 450 Hutt ' .;' Kiwitea 250 3,000 1,000 G. R. Carried 250 850 Not in compliance with terms of Act. Steps to obtain loans were taken by K.iwitea Road Board, and merger of road district in county is not yet completed. Ditto. Mackenzie Manawatu 420 1,000 300 850 100 775 200 200 250 P.G. P.G. G. R. G. P.G. G. P.G, Carried Carried Carried 850 775 200 Construction of Cheltenham Cross Road Bridge Construction of Perry's Road, and widening and construction of Haynes's Road and deviation therefrom Widening and constructing part of Haynes's Road, &c. Half cost of construction of bridge across Pukaki River. Water-races construction in Melville Downs Water-race District Forming, &c, roads in Sandon Riding. Construction of road connecting McDonell's line with ; main road to Sandon and Bulls Construction of streets in Campbelltown Township. Protecting Oroua River bank, near Feilding Cost of repairs of flood-dam-age to Awahuri Bridge Construction of FoxtonShannon Road. Road-construction in Mangatainoka Village Settlement. Construction of Middle Road, Pahiatua Village Settlement. Construction of WoodvilleMangahao Road. Construction of WoodvilleAohanga Road. Construction of bridge over Mangahao River. Metalling the Upper Makuri Road. Erection of bridge over Tiraumea River at Makairo. Formation of the Ohinereita Road Uncompleted. Ditto. Not in compliance with terms of Act. Uncompleted. Uncompleted. 1,500 P.G. ' 1,500 Pahiatua 140 G. Carried 140 131 G. 181 990 G. 900 a • • 500 905 900 P.G. G. G. Rejected Carried 965 900 Uncompleted. a • • 500 G. 500 500 P.G. Carried forward 21,017 10,807 8,160